Putting up a panel-built shed is much easier to plan when you know what is arriving, how it reaches the base and which instructions go with it. This guide helps you prepare; the assembly manual for your particular building controls the fixing positions, sequence, tools and roofing method.
Our ranges do not all assemble in the same way. A modular shed, glazed building and log cabin need different handling and instructions. Open the assembly guides before delivery and use the guide for your actual order when building.
Prepare the ground before the panels arrive
Confirm the required base dimensions and bearer support from your building's base plan. Nominal shed size is not a substitute for that drawing. The foundation must be suitable for the building, site and intended loads, with the specified support, drainage and level tolerances.
Check it with a long straightedge and level in several directions, and check square using the plan's reference points. If the base does not meet the instructions, correct it before assembly; a door adjustment cannot put an uneven foundation right. Our base preparation guide helps you plan that work.
Check delivery access and arrange help
Measure gates, turns, steps and overhead obstructions along the route. Ask for the largest panel dimensions and weights if access or lifting is uncertain. Delivery service and the customer's responsibility for moving components are explained on the delivery page; do not assume panels will be carried through the house or assembled on arrival.
Arrange enough capable help for the actual components, following the manual's lifting guidance. Even a manageable panel can be awkward in wind. Keep children and pets out of the work area and prepare stable supports so components cannot fall or blow over.
Watch the parts come together
A real guide. An example building.
This silent, captioned 26-second film comes from the actual 8 × 6ft pent shed guide. It illustrates the parts and sequence for that example; use your own model’s instructions for the work.
Explore the example in 3D →Unpack against the parts list
Read the whole manual, then identify and count the panels, trims, fixings and roof materials. Store them as directed, clear of wet ground and protected from damage. Keep glazing in its specified packaging and storage position until needed.
Check parts before incorporating them into the building. Photograph damage or a discrepancy and contact us with your order details. Do not cut, force or modify a part to make it fit without checking the instructions. Whether doors arrive hung, windows arrive glazed or trimming is required depends on the model.
Build in the order the manual gives
For many panel-built sheds the broad stages are the floor, wall panels, roof and finishing details. That is an overview, not a universal fixing sequence. Use the numbered parts, fixing sizes, temporary bracing and tightening order in your manual.
Keep panels supported until the specified connections make them stable. Check alignment and square at the stated stages, before later work hides the fixings. If parts resist, stop and check identification, orientation, the base and previous steps. Do not use screws to drag a badly aligned assembly into position, and do not loosen structural fixings while unsupported walls are standing.
Treat roof and glazing work as separate tasks
Wait for suitable weather and use safe access equipment. Never stand on the roof unless the building's instructions explicitly provide for it. Roofing sheets and membranes can catch the wind, and glazing requires its own handling precautions.
Use the supplied covering's instructions for adhesive, weather limits, fixing centres, overlaps and cure times. Our EPDM fitting guide is useful alongside the exact kit instructions; it does not replace them. Finish seals, trims and drainage before storing anything that could be damaged by water.
Finish with the care requirements
Check the door, windows, fasteners and roof details against the final checklist. Treat exposed timber cuts, holes and notches with the specified preservative. For timber-clad buildings, the current written warranty also requires a suitable oil- or spirit-based preservative within 30 days of installation and at least annually, inside and out.
Read the complete guarantee conditions and keep the maintenance guide handy. Assembly time depends on the building, weather, access and experience; book sufficient time for the full job rather than relying on a universal afternoon estimate.
Before you decide
0 of 5 checked
Your checks stay on this page while it is open. Nothing is submitted.
Your questions, answered
Can I assemble a shed on my own?
Follow the staffing and lifting requirements for your exact building. Large panels, roof components and glazing can need more than one person; preparation and small finishing jobs may be separate tasks.
What if a panel does not fit?
Stop before forcing or altering it. Check the part number, orientation, base and earlier assembly stages against the manual. Photograph the problem and contact us if it remains unclear.
Can I book installation instead?
Check the installation option for the building and your location before ordering. Fitting has its own service arrangements and lead time; the required base and access still need to be ready.