Start with the building and the ground
A base must support the actual building and its contents, remain level and allow water to drain away. Find the model’s foundation dimensions and bearer positions before buying materials or digging.
If the ground is soft, sloping, close to trees or retaining structures, or the building will hold heavy equipment, get competent groundwork advice. Check for underground services and plan safe excavation. A generic drawing cannot establish the correct slab thickness or reinforcement for your site.
Still choosing the system? Read the base comparison guide. A pressure-treated timber frame is an extra support structure; it still needs a suitable prepared base beneath its support points.
Six stages, from setting out to assembly
Stage 01
Choose and check the position
Check planning, boundaries, delivery access and space for the doors, roof overhangs, assembly and future maintenance. Confirm ground conditions and locate buried services before excavation.
Stage 02
Mark out the required base
Use the selected model’s actual base dimensions and support drawing. Mark corners and sides, then check both side lengths and diagonals to confirm the rectangle is square. Do not use the nominal product size as a construction drawing.
Stage 03
Prepare the ground and sub-base
Remove unsuitable surface material and construct the specified sub-base for the site. Excavation depth, materials and compaction depend on the ground and loads; follow the groundwork design rather than a universal depth.
Stage 04
Construct the foundation
For concrete, set out the formwork, any reinforcement and moisture-control details to the design, then place the specified mix and finish it level. For slabs, frames or grids, follow that system’s support, bedding and fixing instructions.
Stage 05
Protect, cure and check
Follow the concrete supplier’s curing and weather-protection instructions. Load the slab only when it has reached the required strength. Check the completed base for level, dimensions, squareness, movement and drainage.
Stage 06
Confirm it is ready for assembly
Check every required support position and clear the working area. If fitting is booked, have the base ready before the fitting visit and tell the team early if it is delayed. Delivery-only unloading arrangements are separate.
Plan the equipment around the chosen method
Try it for your project
Turn your base design into volumes
Use the dimensions and layer thicknesses specified by your groundwork designer. This is a volume estimate, not a structural design or an order quantity.
Layer diagram is illustrative; thickness is exaggerated for visibility.
Includes 0.072m³ extra. Confirm the final quantity with your supplier.
How this tool works
Volume = width × length × thickness. Millimetres are divided by 1,000; feet are multiplied by 0.3048. The optional allowance is added once to that volume.
This calculates a rectangular layer only. The 100mm default is an example, not a recommended slab thickness. Ground conditions, reinforcement, support, drainage and the selected building determine the design. It does not include excavation, sub-base, compaction, delivery charges or conversion to tonnes or bags. Ask the supplier to confirm the order quantity and rounding.
Compare the base options →For setting out and checking, a tape measure, pegs, string line, long straightedge and spirit level are useful. Excavation, compaction, concrete placement or paving need the appropriate tools, materials and protective equipment for that work.
Order the specified concrete mix and sub-base materials. Do not change the water content to make a mix easier to handle without supplier guidance. Fresh concrete can cause burns: follow the supplier’s handling advice and arrange the right protection and washing facilities.
For a proprietary timber base or plastic grid, use its installation instructions rather than the concrete illustration. Check support spacing, infill, fixings and the permitted loads for the actual system.
Concrete that looks dry is not necessarily ready to carry a shed. Curing and loading depend on the mix, design and conditions. Get the required loading time from the supplier or installer; do not rely on a universal “48 hours”.
Your ready-for-assembly checklist
Your preparation list
Ready for the building?
0 of 7 checks recorded in this visit.
Resolve anything you cannot confirm with the groundwork installer and the building’s instructions. Your ticks are a personal checklist, not a certification or a message to the fitting team.
A much larger slab can create an exposed ledge that catches water. Follow the model’s base detail and design the surrounding drainage, rather than adding an arbitrary margin on every side.
For a booked installation, have the completed base ready for the fitting team. If your groundwork is delayed, contact us early. If the order is delivery-only, follow the unloading and storage arrangements and keep components protected until assembly.