Make sure you have the right kit and conditions
Your preparation list
Before any adhesive goes down
0 of 5 checks recorded in this visit.
Check the exact kit instructions and ask us about missing or mismatched parts before starting. Your ticks are a personal checklist, not a certification or a message to the fitting team.
Check the membrane, specified adhesive, edge-finishing parts and fixings against your order. Your tools and access equipment are separate from the roof package unless your order says otherwise.
- Choose conditions within the adhesive and membrane supplier’s temperature and weather limits.
- Use safe access equipment. Do not assume a shed roof is designed to take a person’s weight.
- Read the adhesive instructions and provide the ventilation and protective equipment they require.
- Check roof shape, drainage direction and the required edge allowances before cutting.
If the kit or instructions do not match your building, ask our team before starting.
The five main stages
- 1
Check the deck and lay out the membrane
Confirm that the roof deck is the type and condition specified by the roof-kit supplier: sound, clean, dry and free of sharp projections. Lay out the membrane with the specified allowance at every edge before bonding anything.
- 2
Allow the membrane to settle
Leave the sheet flat for the relaxation time given in its instructions. The time depends on the product and conditions; avoid stretching the membrane to force out creases.
- 3
Expose the area you will bond
Fold or roll back the section described in the supplied fitting method, keeping the sheet aligned and the required edge allowances in place. Work in manageable areas.
- 4
Bond with the specified adhesive
Use the adhesive and application method supplied for your roof. Follow its temperature limits, ventilation precautions, coverage, open time and curing instructions. Some products have different methods for the main deck and roof edges.
- 5
Finish and check the edges
Fit the specified edge details, trims and fixings in the order shown in your kit instructions. Trim carefully, avoiding damage to the roof membrane. Check drainage and finish all edge details before considering the roof complete.
Check the finish. Keep the roof clear.
Allow the specified curing period, inspect the completed edges and check that water can drain freely. Afterwards, inspect the covering periodically and after severe weather. Clear debris carefully and prevent branches or sharp objects from damaging the membrane.
The roof’s anti-leak warranty is 20 years as supplied, or 30 years when fitted by our professional installation team, subject to the written conditions and exclusions.







